ReliaRing
Get Started

Running a Test on Demand and How Retries Work

Updated July 26, 20264 views0 found helpful

Dial a monitored line immediately instead of waiting for the schedule, and understand how ReliaVerify retries a failing line before it alerts you.

You do not have to wait for the next scheduled check. You can dial a monitored line whenever you want — after repair work, before an inspection, or to confirm a new monitor is set up the way you expect.

Run a test now

  1. Go to Line Verification → Monitors.
  2. Open Configure Tests on the monitor you want.
  3. Press Run on the test.

The run appears in Line Verification → History within a few seconds, first as pending, then running, then with its result. You can run up to ten tests a minute across your account.

An on-demand run counts against your monthly test allowance exactly like a scheduled one. On the Basic and Standard plans, runs beyond the allowance are billed as extras and need available account balance.

Trying out a new monitor

Run a new monitor manually once before trusting it. It tells you two things a schedule cannot tell you for hours: that the line answers at all, and — if you are using a touch-tone rule — exactly which digits it sends, so you can set the required sequence correctly.

How retries work

A single failed call is not always a broken line. Someone may have been on the phone, or the call may have arrived a moment after the handset was lifted. So ReliaVerify can re-dial before it decides.

  • Max Retries — how many extra calls to place after the first one fails. Up to five.
  • Retry Delay — how many minutes to wait between attempts, from 1 to 60.
  • Exponential backoff — when on, each wait is double the one before, so a 5-minute delay becomes 5, then 10, then 20. When off, every wait is the same.

The run only counts as a failure once every attempt has failed. If any attempt succeeds, the run is a pass.

Each attempt is stored separately, so a line that failed twice and answered on the third try shows in History as one passing run made of three attempts. That pattern is worth attention: a line that always needs a retry is usually on its way to failing outright.

When you get told

Alerts go out when the run finishes, not on each attempt. With five retries at 10-minute intervals, an alert can be close to an hour behind the first failed call. If you need to know sooner, lower the retry count or the delay.

Related articles

Related Topics

reliaverifymanual-testretriestesting
Was this article helpful?

Still have questions?

Email help@reliaring.com or open a ticket from the portal — existing customers can track it there.